FreeNeb Status Report 2017-11-27

来自cslt Wiki
跳转至: 导航搜索

This Week:

People Last Week This Week Next Week Task Tracing(DeadLine)
Mengyuan Zhao
  • Engineering
  1. Embedded ASR APP.
  2. Set up py-server on our Alibaba cloud server.
  3. Set up py-server on Tom's server.
  4. Draft document for roobo project.
  • Engineering
  1. Try to finish server version of TTS DEMO.
Zhiyong Zhang
  • Finished multi-speaker TTS training by inserting dvector40 to linguistic-features.
  • Test on Huilian female01/male01/male02, Roobo child01.neutral


  • To train duration-model using 16k data.
Yang Wei
  • Finish testing FreeNeb embeded ASR engine
  • Test FreeNeb TTS engine.
Dong Wang
  • ICASSP
  • OC2017


Zhenlong Han
  • Finish training TDNN with different splice and cnn-tdnn model.
  • English embedded model training.
Shuai Zhang
  • According to the feedback, modify the project.
  • Complete the VVParrot project
  • Add the documents about the two project


Yanchi Jin
  • Complete the megrez_test and already deploied on the server.
  • Start to use the megrez_tool complete same simple structure chart.
  • Complete the interface of megrez_test and the chart of structure.