2022-09-26

来自cslt Wiki
2022年9月26日 (一) 10:15Chenrenmiao讨论 | 贡献的版本

跳转至: 导航搜索
People This Week Next Week Task Tracking (DeadLine)
Dong Wang
Lantian Li
Ying Shi
Chen Chen
  • Finish draft
  • pre-process CMLR data
  • Train ASR model on GRID and test WER
  • Train VTS model on CMLR single spk
  • Train VCA-GAN
  • Prepare weekly-reading report
Pengqi Li
Zixi Yan
Sirui Li
Haoyu Jiang
Ruihai Hou
Renmiao Chen
  • Finish tools for get LiRAVD
  • Extract embedding from LiRAVD and get results
  • Complete the remaining benchmarks
Wenqiang Du
Wan Lin
Tianhao Wang
Xipin Wei
  • Read the music generation documents
  • The scheme of mutil-track-instruments
  • The scheme of mutil-track-instruments