Work-progress 2017.02

来自cslt Wiki
2017年2月16日 (四) 09:41Wangyd讨论 | 贡献的版本

跳转至: 导航搜索

Daily Report

Date Person start leave hours plan status
2017.2.16 Tongzheng Ren
Yaodong Wang 10 A.m 6:30 P.M 8.5h Improve the stock pool data Finish filtering the susupension condition
2017.2.13 Tongzheng Ren
Yaodong Wang 9:30 A.m 6 P.M 8.5h Complete the stock pool data Finish almost of it
2017.2.11 Tongzheng Ren
Yaodong Wang 1 P.m 8 P.M 7h Deal with making a stock pool in different industries Complete half
2017.2.10 Tongzheng Ren Implement the strategy. Finish the strategy.
Yaodong Wang 9:30 A.M 6:30 P.M 9 h Finish the view in the mysql and prepare for updating data Finish the view and figure out how to get the up-to-date data
2017.2.9 Tongzheng Ren Try to use the backtesting frame pyalgotrade to implement the strategy. Know the pyalgotrade frame.
Yaodong Wang 9:30 A.M 9 P.M 12.5 h Deal with the view in the mysql and different query Finish half of the view