FreeNeb status Report 2018-01-08

来自cslt Wiki
2018年1月8日 (一) 01:47Zhaomy讨论 | 贡献的版本

跳转至: 导航搜索
在此页面是受到安全限制

This Week:

People Last Week This Week Meet Minutes Task Tracing(DeadLine)
Mengyuan Zhao
  • Engineering
  1. Finish Online-ASR Demo.
  • Engineering
  1. Deliver Embedded-ASR engine to Fenyinta.
  2. Check and release TTS Demo.
  3. Write documents.
  • Roobo
  1. Prepare a workshop(half a day) in Jan 2018 after Jan.20,2018.
  • Engineering
  1. Put DEMO code into Gitlab before Jan.2.
  2. Draft documents for many engines: fnasr, fntts, deepfe....
  1. Online-TTS DEMO (Jan.20,2018)
  2. Online-ASR DEMO (Jan.20,2018)
Zhiyong Zhang
  • Finished the first version(draft) of technical solution document for THS。
  • To integrate Merlin7 front-end linguistic extracting to KALDI.
  • Myhexin
  1. Finish validation before Jan.3, and deliver document to Myhexin.
Yang Wei
  • Design test cases for TTS effect
  • Test FreeNeb ASR on server
  • Finish test multi-speaker, multi-emotion TTS model and engine before Jan.12.
Dong Wang
  • fenyinta contract done.
  • spot discussion
  • Anual distribution


Zhenlong Han
  • Train some model dark knowledge in tonghuashun

http://192.168.0.51:5555/cgi-bin/bugdb/cvss_request.pl?account=hanzl&step=view_request&cvssid=32

  • English embedded model training.
  • Finish train English model before Jan.8.
Shuai Zhang
  • Fixed bugs of the VVParrot.
  • Test the VVParrot.
  • Modify the edit-distance algorithm.
  • the VVParrot will be shown 5th Jan.
Yanchi Jin
  • Already update the database.
  • Complete the Megrez_tool and the chart of structure.
  • Continue update the database.