People |
Last Week |
This Week |
Meet Minutes |
Task Tracing(DeadLine)
|
Mengyuan Zhao |
- Optimize TTS-pyserver to speed up.
- Working on online-ASR DEMO.
|
- Try to finish first version of online-ASR APP.
- Clean up code and draft documents.
|
- Prepare a workshop(half a day) in Jan 2018 after Jan.20,2018.
- Improve speed of TTS engine
- Draft documents for many engines: fnasr, fntts, deepfe....
|
- Online-TTS DEMO (Jan.20,2018)
- Online-ASR DEMO (Jan.20,2018)
|
Zhiyong Zhang |
- Retrain 100h 16k TTS training
- The synthesised waves still not seems well, hold
- Contact with THS about exist technical problems, still not receive feedback
- I have finished part of the technical solution
- Contact with Aiweier, and end the cooperation.
|
|
- Contact with Aiweier. --Done
- Draft a document and contact with Myhexin.
|
|
Yang Wei |
- Locate a failed case
- Test the cases that client close incidentally.
|
- Test the cases that network is not stable.
|
- Continue test TTS pyserver
|
|
Dong Wang |
- Some discussion with Fenyinta
- Some discussion with Japan Tongfang
- More people will join!
|
|
|
|
Zhenlong Han |
- English embedded model finish, and cloud model have training 700 model
libri_clean wsj_eval92 wsj_eval93 voxforge libri_other
recipe_result 6.95 6.4 16.29
embedded_6X400X800_tl_xent 13.49 8.05 10.9 12.83 32.82
embedded_6X400X800_tl_xent_kt 13.71 8.12 11.44 12.92 31.86
cloud_6X1200X8000_tl_xent_kt_700mdl 6.42 8.63 11.59
|
- English embedded model training.
|
- Prepare all the ASR models:
|
|
Shuai Zhang |
- Test the Megrez project overall
- fixed the bugs in answering the question.
|
- Complete the VVParrot project.
- Modify the edit-distance algorithm.
|
|
- the test by ourselves about the Megrez will be done 20th Dec.
- the VVParrot will be finished the standard function 28th Dec which will include login, register, record the score and get the sentence randomly.
|
Yanchi Jin |
- Already update the database.
|
- Complete the Megrez_tool and the chart of structure.
- Continue update the database.
|
|
|