|
|
第43行: |
第43行: |
| |- | | |- |
| |Dong Wang|| | | |Dong Wang|| |
− | * Second round call for people done, share done, plan initialized. | + | * fenyinta contract done. |
| + | * spot discussion |
| || | | || |
− | * More discussion on 'spot' of our 2018. | + | * Anual distribution |
| || | | || |
| | | |
People |
Last Week |
This Week |
Meet Minutes |
Task Tracing(DeadLine)
|
Mengyuan Zhao |
- Finish Online-ASR Demo.
|
- Deliver Embedded-ASR engine to Fenyinta.
- Check and release TTS Demo.
- Write documents.
|
- Prepare a workshop(half a day) in Jan 2018 after Jan.20,2018.
- Put DEMO code into Gitlab before Jan.2.
- Draft documents for many engines: fnasr, fntts, deepfe....
|
- Online-TTS DEMO (Jan.20,2018)
- Online-ASR DEMO (Jan.20,2018)
|
Zhiyong Zhang |
- Finished the first version(draft) of technical solution document for THS。
|
- To integrate Merlin7 front-end linguistic extracting to KALDI.
|
- Finish validation before Jan.3, and deliver document to Myhexin.
|
|
Yang Wei |
- Test the cases that network is not stable.
|
- Continue test TTS pyserver
|
- Finish test multi-speaker, multi-emotion TTS model and engine before Jan.12.
|
|
Dong Wang |
- fenyinta contract done.
- spot discussion
|
|
|
|
Zhenlong Han |
- Train some model dark knowledge in tonghuashun
- Figure out English model.
|
- English embedded model training.
|
- Finish train English model before Jan.8.
|
|
Shuai Zhang |
- Fixed bugs of the VVParrot.
|
- Test the VVParrot.
- Modify the edit-distance algorithm.
|
- Build VVParrot on cloud server before Jan.5.
|
-
- the VVParrot will be shown 5th Jan.
|
Yanchi Jin |
- Already update the database.
|
- Complete the Megrez_tool and the chart of structure.
- Continue update the database.
|
|
|