“Asr-progress 2017.01”版本间的差异

来自cslt Wiki
跳转至: 导航搜索
Daily Report
第41行: 第41行:
 
* Take photos for members in CSLT
 
* Take photos for members in CSLT
 
* Check book
 
* Check book
 +
|-
 +
|-
 +
| rowspan="5"|2017.1.4
 +
|Ying Shi ||  ||  ||  ||
 +
|- 
 +
|Hang luo ||  ||  ||  ||
 +
|-
 +
|Yixiang Chen || || ||  ||
 +
|-
 +
|Yanqing Wang ||    ||    ||    ||
 +
|-
 +
|Jingyi Lin || 11:00am  || 6:10pm || 7h10m ||
 +
* Bi-monthly report
 +
* Take and arrange photos

2017年1月4日 (三) 09:16的版本

Daily Report

Date Person start leave hours status
2017.1.1 Ying Shi 1:30pm 10:00pm 8h30min make new test set for kazak speech recognition
Hang luo
Yixiang Chen
Yanqing Wang
Jingyi Lin
2017.1.2 Ying Shi 1:30pm 9:00pm 7h30min make new test set for kazak speech recognition and retrain TDNN with fbank feature
Hang luo
Yixiang Chen
Yanqing Wang
Jingyi Lin
2017.1.3 Ying Shi 9:10am 10:00pm 12h50min 哈萨克语料的转换,完成了元音到前元音的转换,完成了代表序数的数字的转换(19- 代表第19),完成了代表范围的数字的转换(0-9 代表0到9 “-”前边的数字不同所写的‘-’的写法不同)
Hang luo 1:00pm 10:00pm 9h Finished latex version of joint training and mixlingual report
Yixiang Chen
Yanqing Wang
Jingyi Lin 9:40am 5:40pm 8h
  • Prepare for the Annual Meeting
  • Take photos for members in CSLT
  • Check book
2017.1.4 Ying Shi
Hang luo
Yixiang Chen
Yanqing Wang
Jingyi Lin 11:00am 6:10pm 7h10m
  • Bi-monthly report
  • Take and arrange photos