“Work-progress 2017.01”版本间的差异

来自cslt Wiki
跳转至: 导航搜索
Daily Report
Daily Report
第3行: 第3行:
 
{|class="wikitable"
 
{|class="wikitable"
 
! Date !! Person  !! start!! leave !! hours !! plan !!status
 
! Date !! Person  !! start!! leave !! hours !! plan !!status
 +
|-
 +
| rowspan="2"|2017.1.16
 +
|Tongzheng Ren ||||  ||  || ||
 +
|- 
 +
|Yaodong Wang ||10 A.M||6:30 P.M ||8.5hh  || Solve the bug in table ASHARETRADINGSUSPENSION and Relaese the databases  || Have Solved the bug and release the databases
 +
|-
 
|-
 
|-
 
| rowspan="2"|2017.1.15
 
| rowspan="2"|2017.1.15

2017年1月16日 (一) 09:38的版本

Daily Report

Date Person start leave hours plan status
2017.1.16 Tongzheng Ren
Yaodong Wang 10 A.M 6:30 P.M 8.5hh Solve the bug in table ASHARETRADINGSUSPENSION and Relaese the databases Have Solved the bug and release the databases
2017.1.15 Tongzheng Ren
Yaodong Wang 2 P.M 12:00 P.M 10h Finish inserting the other data into databases Finish inserting the other data into databases
2017.1.14 Tongzheng Ren
Yaodong Wang 1 P.M 11:30 P.M 10.5h Finish the technical report and Inserting the other data into databases Finish the technical report and insert one half of datas
2017.1.13 Tongzheng Ren
Yaodong Wang 10 A.M 12 P.M 14h Finish the technical report and Inserting the other data into databases Nearly finish the technical report
2017.1.11 Tongzheng Ren
Yaodong Wang 10 A.M 6 P.M 8h Get another stock data and Make the factor databases easy to use Get the data ready and Wait to organize the data
2017.1.10 Tongzheng Ren
Yaodong Wang 10 A.M 10 P.M 12h Complete the month return table Finish the half
2017.1.7 Tongzheng Ren
Yaodong Wang 11 A.M 11 P.M 12h Finish all the databases Finish them all(7)
2017.1.5 Tongzheng Ren
Yaodong Wang 10 A.M 10:30 P.M 12.5h Finish inserting factorData into database Finish three databases
2017.1.4 Tongzheng Ren
Yaodong Wang 10 A.M 9:30 P.M 11.5h Finish one half of databases Studying the fama_macbeth code for python and Finish inserting sp_500 data and 1min_stock data into database
2017.1.3 Tongzheng Ren
Yaodong Wang 10 A.M 7:30 P.M 9.5h Finish the technical report Making a technical report for testing single factor (here)