“Hulan-2014-09-24”版本间的差异

来自cslt Wiki
跳转至: 导航搜索
Lr讨论 | 贡献
Coordination
 
(2位用户的11个中间修订版本未显示)
第1行: 第1行:
 
=TTS=
 
 
  
 
=Dialog system=
 
=Dialog system=
 +
 
== Coordination ==
 
== Coordination ==
 +
 
* inter student is needed
 
* inter student is needed
 
* code synchronization
 
* code synchronization
:*  git of tsinghua to design core algorithm
+
:*  git of tsinghua to design core algorithm,"git@192.168.0.51:textproc/productdevelopment.git"
 
:*  svn of huilan to design web application
 
:*  svn of huilan to design web application
*labeling platform
+
 
==frame work==
+
* data transfer
+
*
+
 
==algorithm==
 
==algorithm==
* query rewrite will to using standford tools and waiting a intern.
+
 
 +
* query rewrite will to use stanford tools and waiting a intern.[http://www-nlp.stanford.edu/software/sempre/]
 
* GA algorithm finished and waiting to test the parameter
 
* GA algorithm finished and waiting to test the parameter
*
 
  
=System design=
+
==System implementation==
  
 +
* container-component framework finalized
 
* Yongtao will help to design a labeling platform
 
* Yongtao will help to design a labeling platform
 +
 +
=From Xinkai=
 +
 +
本周议题:
 +
 +
* 上周遗留问题进展审视;
 +
 +
:* 开发计划讨论和对齐;
 +
:# 邢超正在做的词向量方法暂停,改为验证stanford的复述工具;
 +
:#“基于实体、问题类别、文法自动生成/匹配模板”加入开发计划,启动时间待定;
 +
:# 其它计划继续不变,进度正常;
 +
:* 核心擎部分代码框架讨论;
 +
:# 根据王老师的思路和重构过程中遇到的问题一起进行了讨论完善;
 +
* 其它
 +
后续训练集,评测集和评测结果要纳入统一的管理,责任人:杜新凯

2014年9月25日 (四) 01:23的最后版本

Dialog system

Coordination

  • inter student is needed
  • code synchronization
  • git of tsinghua to design core algorithm,"git@192.168.0.51:textproc/productdevelopment.git"
  • svn of huilan to design web application

algorithm

  • query rewrite will to use stanford tools and waiting a intern.[1]
  • GA algorithm finished and waiting to test the parameter

System implementation

  • container-component framework finalized
  • Yongtao will help to design a labeling platform

From Xinkai

本周议题:

  • 上周遗留问题进展审视;
  • 开发计划讨论和对齐;
  1. 邢超正在做的词向量方法暂停,改为验证stanford的复述工具;
  2. “基于实体、问题类别、文法自动生成/匹配模板”加入开发计划,启动时间待定;
  3. 其它计划继续不变,进度正常;
  • 核心擎部分代码框架讨论;
  1. 根据王老师的思路和重构过程中遇到的问题一起进行了讨论完善;
  • 其它

后续训练集,评测集和评测结果要纳入统一的管理,责任人:杜新凯